Projects / Reference Project
DRILLING SHIP - ROV INTEGRATION PROJECTS WITH PLATE NESTING
Reference Project; DRILLING SHIP - ROV INTEGRATION PROJECTS WITH PLATE NESTING
Hydraulıc Analysıs:
TÜPRAŞ İzmit Refinery plans to use the 10G-321 pump, currently located in the Bulk Loading Unit, to replace the 10G-323 pump currently operating in the isomerate service of the Petroleum Transfer Unit. The purpose of this study is to determine the performance of the 10G-321 pump in its new service. The pump was evaluated for the operation of transferring isomerate product from the Petroleum Transfer Unit to railcars in the Bulk Loading Unit.
Let’s Work Together
Have a project in mind? Our engineering experts are ready to help you turn your ideas into reality.

